Climatic Low and High Temperature Control Testing Chamber

Model NO.: LHC-25
Product: Lab Digital Constant Temperature Hot Plate
Trademark: CIVITTEST
Transport Package: 9mm and 15mm Plywood Package
Specification: stainless steel
Origin: China
HS Code: 8514
Model NO.: LHC-25
Product: Lab Digital Constant Temperature Hot Plate
Trademark: CIVITTEST
Transport Package: 9mm and 15mm Plywood Package
Specification: stainless steel
Origin: China
HS Code: 8514

Climatic Chamber  
(Low and High Temperature Control Testing Chamber)                                      
LHC-18                                                    
1. Temperature Control: -25-+60ºC
2. Humidity Range: 20-95%
3. Stainless steel construction, isolation by high density polyurethane.


Climatic Low and High Temperature Control Testing Chamber


IV. Company products 
1. Drying, weighing and Grading Equipment and tools.
2. Soil, Rock and Aggregate Testing Equipment.
3. Concrete, Cement and Mortar Testing Equipment.
4. Asphalt and Steel Testing Equipment.
5. Scientific and General Lab Equipment.
6. Survey Instrument and Detector.
 Climatic Low and High Temperature Control Testing Chamber


V. Our Service
1. Production:
Our factory choose high quality material include steel, stainless steel, circuit board, motor, etc. By strict and efficient production and inspection, products are in high quality and possible low cost.
 


2. Shipment:
We use 9mm and 15mm thick plywood as packing, heavy machine will be packed in high strength to keep it intact during shipment. We ship goods out from company in shortest time and book fast ship to make sure customer can get goods quickly.
 

3. After sales:
After shipment, we will delivery shipping documents to customer correctly and quickly. Supply one year warranty for all machines, after one year, we will still supply quick and effective after sales solution.
 

VI. Terms:
1. Production time: for common products: 7days; for special order: 15days.
2. Payment terms: T/T, L/C or other payment can be negotiated before shipment.
3. Shipment: sea shipment, air shipment, fast courier shipment according to customer advice.
4. Inspection and Calibration: technician do it strictly before shipment.
5. Installation: most of equipments be fixed well before shipment, we will guide installation step by step for other equipments.
6. Training: usually do it in our factory, for special requirement, can arrange technician go to customer site for training.
7. Warranty of machine: usually one year.

VII. Contact us
Hangzhou Civit Instrument Equipment Co., Ltd.
Website: www.civittest.com
Tel: 0086-571-28202862
Fax: 0086-571-87272769
Mobile: 0086-13588310953
 
 
 

 

Climatic Chamber  
(Low and High Temperature Control Testing Chamber)                                      
LHC-18                                                    
1. Temperature Control: -25-+60ºC
2. Humidity Range: 20-95%
3. Stainless steel construction, isolation by high density polyurethane.


Climatic Low and High Temperature Control Testing Chamber


IV. Company products 
1. Drying, weighing and Grading Equipment and tools.
2. Soil, Rock and Aggregate Testing Equipment.
3. Concrete, Cement and Mortar Testing Equipment.
4. Asphalt and Steel Testing Equipment.
5. Scientific and General Lab Equipment.
6. Survey Instrument and Detector.
 Climatic Low and High Temperature Control Testing Chamber


V. Our Service
1. Production:
Our factory choose high quality material include steel, stainless steel, circuit board, motor, etc. By strict and efficient production and inspection, products are in high quality and possible low cost.
 


2. Shipment:
We use 9mm and 15mm thick plywood as packing, heavy machine will be packed in high strength to keep it intact during shipment. We ship goods out from company in shortest time and book fast ship to make sure customer can get goods quickly.
 

3. After sales:
After shipment, we will delivery shipping documents to customer correctly and quickly. Supply one year warranty for all machines, after one year, we will still supply quick and effective after sales solution.
 

VI. Terms:
1. Production time: for common products: 7days; for special order: 15days.
2. Payment terms: T/T, L/C or other payment can be negotiated before shipment.
3. Shipment: sea shipment, air shipment, fast courier shipment according to customer advice.
4. Inspection and Calibration: technician do it strictly before shipment.
5. Installation: most of equipments be fixed well before shipment, we will guide installation step by step for other equipments.
6. Training: usually do it in our factory, for special requirement, can arrange technician go to customer site for training.
7. Warranty of machine: usually one year.

VII. Contact us
Hangzhou Civit Instrument Equipment Co., Ltd.
Website: www.civittest.com
Tel: 0086-571-28202862
Fax: 0086-571-87272769
Mobile: 0086-13588310953
 
 
 

 

Gas Isothermal Normalizing Furnace

Industrial Furnace,Normalizing Production Line,Heat Treatment Production Line,Gas Isothermal Normalizing Furnace

Huzhou Zhongke Furnace Industry Technology Co., Ltd , https://www.zkfurnace.com