Crane violations

In severe weather such as heavy rain, heavy snowfall, heavy fog, and strong winds of class 7, operations should be stopped to prevent accidents. When you need to apply for second- and third-level operation permit, you should see the operation permit before you can perform the operation. It is strictly forbidden to drive a sick car to drive a qualified vehicle, in order to prevent traffic accidents caused by the breakdown of the vehicle and lifting injuries. Regarding the emergency stop signal, the driver should stop immediately regardless of anyone sending it out. The speed limit should be 15Km/h in the train and should be reduced to 6Km/h when crossing the railroad crossing to prevent collision with vehicles, pedestrians or trains. When lifting the job site is unclear, lifting operations are strictly prohibited to prevent lifting accidents. When you need to apply for second- and third-level operation permits, you should see the operation permit before you can perform operations.

吊车

Other illegal activities related to this position; off post, string post, chaos post, sleeping post; (especially serious violation). Failing to maintain and maintain the equipment of this post according to regulations; (general violations), discovering other people's violations of regulations, and stopping or rectifying them according to the regulations; (general violations) do not carry out “tour inspections” of positions as required; (general violations) . Failed to participate in safety activities as required; (general violation). Engage in activities unrelated to this position; (general violations). Possible accidents or emergencies. According to the actual situation of the job and the analysis of hazard factors, the foreseeable accidents are: lifting injury accidents, traffic accidents, and fire accidents. Lifting injury accident emergency response. When a hoisting injury accident occurs, the first discoverer will call the on-site operation personnel to call the police. The on-site personnel shall take correct evasive measures , and at the same time, perform simple rescue on the injured and report to the emergency leader of the transport loading and unloading team. The emergency leader of the transport loading and unloading team shall promptly call the emergency number “ 120 ” (landline) or “ 25921111 ” (mobile phone) after receiving the alarm . (Alarm personnel shall be brief and clearly report the casualties and specific locations of the personnel). Traffic accident emergency response. In the event of a traffic accident, the driver should immediately evacuate the vehicle 50 meters away from the accident and place a warning sign at 100 meters before and after the accident scene . He immediately dials 122 (oilfield internal 25922010 ) and reports to the team leader. If someone is injured, the driver or other driver or passenger should immediately call the general hospital emergency center ( 25921111 ) or 120 . The driver is responsible for the protection of the scene and assists traffic police officers in the investigation and handling of the accident.

Primary fire emergency operations. Cry for help. When a fire is found, the driver should immediately flee the vehicle and evacuation to a safe zone. At the same time, he should report to 119 , 122 (mobile phone alarms 25920119 , 25921111 ) and use a fire extinguisher on board to extinguish the fire; if the fire is difficult to control, he should immediately evacuate to safety. zone. In case of casualties after a vehicle fire, the driver should immediately call the emergency center at 120 (mobile phone 25921111 ) for help and on-site emergency services.

Basic knowledge; four understanding three sessions: understand the performance, understand the principle, understand the structure, understand the use; will operate, will maintain, will eliminate the fault. "Cross operation method": Clean, lubricate, adjust, fasten, and protect. "Three non-harm": No harm to others; no harm to others; no harm to yourself. “Five pests”: harming themselves, harming families, harming others, harming units, harming the country. Fire four understand four sessions: understand the danger of fire; understand preventive measures; know how to save; understand escape methods. It will alarm; it will use fire-fighting equipment; it will handle dangerous accidents; it will choose the escape route. Self-help and mutual rescue knowledge. First aid points for lifting injuries, after the occurrence of a lifting accident, the on-site personnel should not be afraid and panic. Keep calm, quickly check the injured, and rescue according to the injury situation, such as rescue, and immediately rescue the injured from danger. Wait 120 ambulances arrive, while doing emergency treatment such as hemostasis, bandaging, and cardiopulmonary resuscitation; when calling an emergency phone, pay attention to the following questions: ( 1 ) Explain the exact location of the wounded person to the doctor on the phone, and contact the method ( such as phone number ) , driving directions.

Safety knowledge of the crane 1. Workers at high altitude should hang up the safety belt. The first use and wearing of the safety belt should comply with the relevant provisions of the current national standard "safety belt" ( GB6095 ). 2. During the construction of the building, close-up safety nets shall be used to close the building (or take protective measures). 3. During the construction process, effective measures shall be taken to tightly and firmly seal various holes in the construction site and buildings. 4. A protective shelter shall be erected above the concentration of personnel activities and above the entrances and exits. 5. The safety technical measures for aerial work shall be determined in the construction plan and completed before construction. Finally, the experience shall be confirmed to meet the requirements. 6. Personnel working at height should perform regular physical exercise as required. 7. If the work edge has no maintenance facilities or the maintenance height is lower than 800mm , a main protective facility must be installed; the height of the protective railing of the horizontal working face is 1.2m , and the guard railing is closed with a safety grid, or a height of not less than 180mm is set at the bottom of the railing . Footrests.


Flux Cored Welding Wire Production Line

flux-cored wire Production line main processing

(1) steel strip rewinding: pay off strip →constant tensile rack→ spool take up

(2) forming and rough drawing machine: pay off → constant tensile rack→ forming into U shape-→servo powder adding system →forming and reduce diameter→ LZ6/500 drawing machine → spool take up

(3) pay off → LZ10/400 reduced diameter →polishing machine →spool take up

(4) the layer winding: about 15-25KG each packing

Flux Cored Welding Wire Production Line,Flux Cored Wire Drawing Machine,Seamless Flux Cored Wire Production Line,Seamless Flux Cored Wire Product Line

Jiangyin Wanyi Machinery CO.,Ltd , https://www.wydrawmachine.com