On December 12, Fushun Petrochemical’s large ethylene hydrocracking reactor was successfully hoisted. This reactor is the core equipment of the hydrocracking unit and is the heaviest unit for the entire project. The reactor is 34 meters high and weighs 680 tons. It is hoisted on the site using the "double-lift method" and is hoisted by a 1350-ton crawler crane and a 600-ton crane.
Newbang Machinery Co., Ltd. , http://www.ycflailmower.com