Salvage Marine Ship Launching Lifting Rubber Ship Airbag

Diameter (D): From 0.5m to 2.5m
Effective Length (EL): From 5.0m to 28.0m
Total Length (Tl): From 6.0m to 29.5m
Standard Number of Layers: Usually 4-12 Layers
Trademark: Aohai
Transport Package: as Customer Request
Specification: see attached
Origin: China
HS Code: 40169400
1. Primary business:

Aohai Marine Fittings Co., Ltd mainly produce:

**Ship Launching Airbags

**caisson moving airbag

** Refloating and salvaging airbag

**Lifting airbag

**Rubber inflatable mandrel

**Pipe Tamper


Pneumatic marine rubber fenders, Yokohama Fender, Super cell fenders (SC type), Cone fenders, Super Arch fenders (type SA), Cylindrecal fenders (Type Y), Semi-circular fenders (Type D), Type GD fenders, Type I fenders, Type U fenders,Turn cell fenders, Type π rubber fenders, Rubber ladder, Rubber fenders for tug boats,  PVC yacht fenders etc.
 
We have 15 years experience in rubber fender production and our customers include:
Mearsk , MSC, COSCO, CMACGM, OOCL, APL, NYK , NEW YORK port, KOBE port, YOKOHAMA port, Singapore port, ANTWERP port, LONDON port, HAMBURG port, DUBAI port, QINGDAO port, SHANGHAI port etc.
Certificate: ABS, LR, BV, NK, DNV, RINA, RS, IRS,CCS etc.
2.Product description:

High pressure safety explosion-proof launching airbag
 

(1). Using high quality raw material

(2). The unique whole winding process

(3). The size and structure of air bag

 The normal diameter of airbag can be 0.5m-2.5m, length 5-28m, layers can be 4-12 layer.
 Other models c an also be produced according to customer requirements.

(4)Production standards

   Our products manufactured strictly according with the CB/T3795 "ship upgrading, launching  airbag"   standards, factory check strictly before shipping.

(5)Use: a. Ship launching 

              b.Wreck Removal and marine salvage 

              c.Heavy lifting




3. Specifications and Measures:Salvage Marine Ship Launching Lifting Rubber Ship Airbag

Specification of ship launching marine boat airbag 

Some normal sizes of our lift bags  , other sizes are also available

 Diameter(m)

Effective Length(m)

Layer

Pressure(MPa)

1.0

10

5~6

0.07~0.10

1.0

12

5~6

0.07~0.10

1.0

15

5~6

0.07~0.10

1.2

10

5~6

0.08~0.12

1.2

12

5~6

0.08~0.12

1.2

15

5~6

0.08~0.12

1.5

12

5~8

0.08~0.16

1.5

15

5~8

0.08~0.16

1.5

18

5~8

0.08~0.16

1.5

20

4~8

0.08~0.16

1.5

24

5~8

0.08~0.16

1.8

12

5~8

0.08~0.15

1.8

15

5~8

0.08~0.15

1.8

18

5~8

0.08~0.15

1.8

20

5~8

0.08~0.15

1.8

24

5~8

0.08~0.15

2.0

18

6~10

0.08~0.18

2.0

20

6~10

0.08~0.18

2.0

24

6~10

0.08~0.18

2.5

18

7~10

0.07~0.13

2.5

20

7~10

0.07~0.13

2.5

24

7~10

0.07~0.13


Salvage Marine Ship Launching Lifting Rubber Ship Airbag

4..Photos for reference:

Salvage Marine Ship Launching Lifting Rubber Ship Airbag
Salvage Marine Ship Launching Lifting Rubber Ship Airbag

 

Wholesale Pressure Cooker

Operation of electric Pressure Cooker

1. When using the electric pressure cooker, take out the inner tank of the pressure cooker, and then put the ingredients into the inner pot. At the same time, the food and water shall not exceed 4 / 5 of the height of the inner pot, and the food that is easy to expand shall not exceed 3 / 5 of the height of the inner pot. After adding the ingredients, users can add an appropriate amount of water according to their own needs;

2. After the ingredients are put into the inner pot, put the inner pot in the outer pot. When putting into the inner pot, wipe the heating plate of the inner pot. At the same time, when putting into the inner pot, ensure that the inner pot and the heating plate are in good contact.

3. After preparation, check whether the sealing ring has been placed when the pressure cooker lid is closed. At this time, rotate the sealing ring left and right by hand to place it on the steel ring, and rotate it counterclockwise to the buckle position when the lid is put down. 4. After placing the pot cover, turn the pressure limiting vent valve of the electric pressure cooker to the sealing position, and check whether the float valve is placed properly.

5. Connect the power supply of the electric pressure cooker, the indicator light of the electric pressure cooker is on, and set the pressure holding time according to the food.


Hawkins Pressure Cooker

Wholesale Pressure Cooker,Floor Robot Vacuum,Automatic Sweeping Robot Vacuum

Shenzhen Ewong Technology CO.LTD , https://www.ewongteches.com