1. Before turning on the power, wipe the interior of the chamber with alcohol, and then sterilize for one hour with a UV sterilizer lamp or an ozone sterilizer.
2. When the incubator is used in Shanghai, it needs water injection to work properly. Operation method: Plug in the power supply, tighten the water connection, unscrew the bulkhead, and add the water pipe (user-supplied) to the upper left side of the tank, and turn on the power switch. At this time, the buzzer sounds, and the operation panel is at a low level. The indicator light is on. When the water fills to the low water level, the light is turned off. The water injection continues to the overflow outlet and the water overflows. Turn off the power, remove the connection and add the water connector. Pull out the discharge pipe, release about 100ml of water, close the plug, and turn off the power switch.
3, the carbon dioxide special pressure reducing valve is installed on the carbon dioxide cylinder, and there must be no leakage phenomenon at the joint. Place the pressure relief valve output connector on the pressure-resistant hose and connect it with the air inlet connector of the CO2 incubator. Then tighten it with the pressure ring. There should be no leakage at the compression connector. The carbon dioxide cylinder gas total valve does not open temporarily.
4. Turn off the carbon dioxide cylinder before shutting down and turn off the CO2 intake switch and then cut off the power. If it is not used for a long time, the water tray should be taken out, the box should be wiped dry, and the water in the tank should be drained. When the CO2 switch is set to “0â€, the box temperature is energized at 37°C for two hours to ensure that the inside of the box is dry before cutting off the power supply.
2. When the incubator is used in Shanghai, it needs water injection to work properly. Operation method: Plug in the power supply, tighten the water connection, unscrew the bulkhead, and add the water pipe (user-supplied) to the upper left side of the tank, and turn on the power switch. At this time, the buzzer sounds, and the operation panel is at a low level. The indicator light is on. When the water fills to the low water level, the light is turned off. The water injection continues to the overflow outlet and the water overflows. Turn off the power, remove the connection and add the water connector. Pull out the discharge pipe, release about 100ml of water, close the plug, and turn off the power switch.
3, the carbon dioxide special pressure reducing valve is installed on the carbon dioxide cylinder, and there must be no leakage phenomenon at the joint. Place the pressure relief valve output connector on the pressure-resistant hose and connect it with the air inlet connector of the CO2 incubator. Then tighten it with the pressure ring. There should be no leakage at the compression connector. The carbon dioxide cylinder gas total valve does not open temporarily.
4. Turn off the carbon dioxide cylinder before shutting down and turn off the CO2 intake switch and then cut off the power. If it is not used for a long time, the water tray should be taken out, the box should be wiped dry, and the water in the tank should be drained. When the CO2 switch is set to “0â€, the box temperature is energized at 37°C for two hours to ensure that the inside of the box is dry before cutting off the power supply.
Huizhou City Melors Plastic Products Co., Limited , https://www.thefoammaster.com